Levelone GNS-2000 Manual do Utilizador Página 7

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 123
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 6
6
HDD Remove
1. Make sure the NAS Server is power off.
2. Open rear cover of NAS Server.
3. Pull out the HDD till HDD connector release then the HDD
can slide out of slot.
System Installation
Boot up
1. Connect the network cable to LAN port on the rear of NAS
Server. Connect the others end to your hub or switch.
2. Connect the supplied power adapter to a power outlet and
plug the power cord into NAS 
rear panel.
3. Power on
ver
real panel. Press it once to power on the NAS.
4. The NAS Server self-test
The NAS Server will run a brief self-test. During the self-
test, all of NAS Serhing.
5. Booting up
When the self-test is complete, boot up will start. The
Ready LED will blink continuously, and the LAN LED will
blink occasionally. Boot up should take approximately 1-3
minutes.
6. Boot up completed
Vista de página 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 122 123

Comentários a estes Manuais

Sem comentários